What a BUSY, BUSY time of year. I am having a
hard time finishing much on my list lately. I
will continue to plug along hoping that I can get
a few things done each week.
The Week of December 2, 2013
hard time finishing much on my list lately. I
will continue to plug along hoping that I can get
a few things done each week.
The Week of December 2, 2013
(In review)
1. Finish the first clue for Bonnie Hunter's new online mystery
and start working on the second clue to be released on Friday.
I love these green, yellow and neutral chevrons.
2. Finish the Make It Snappy scarves started last week.
3. Finish the Christmas tree skirt recently quilted on my long arm quilting machine, Annie.
I've waited 32 years for a real tree skirt. I'm so glad that I finished this one just in time for Christmas.
4. Bind the Christmas Tree Log Cabin wall hanging recently quilted on Annie.
5. Work on the center block for Wildflower Rhapsody.
No progress.
6. Continue to work through my Flylady inspired Christmas Control Journal.
Everything is on track for a peaceful and joyous Christmas in our home.
7. Complete the next two blocks for the Byrne $5 quilt.
8. Work on some hemming and mending of garments.
No progress.
9. Cut up a bag of scraps I've accumulated over the last few weeks.
No progress
10. Prepare month 3 for the Civil War Tribute quilt.
No progress.
No progress.
11. Work on the following BRODY Projects:
Four-Patch Stacked Posies...Small Print
*Four-Patch Stacked Posies...Large Print
Blue Palace
Meadow - A Christmas Quilt
Civil War Tribute
Two Flag of Valor Quilts
I did a little work on the Large Print Four-Patch Stacked Posies and I finished piecing Jungle Fever.
I was able to piece a backing from my stash of batik fabrics.
12. Work on the quilt currently loaded on Annie -
All Hand Dyes Go Together.
I've made a little progress on All Hand Dyes Go Together but it is not done yet.
13. Add some more hexies to my Bonnie Hunter inspired
Christmas Hexie Quilt.
No Progress.
14. Work on the shawl I am crocheting for
the Prayer Shawl Ministry at St. David the King Church.
No Progress.
15. Spend three days with my main guy, Ryder...including a sleepover!
Yay Me!!!
Ry Bear and I had oodles and oodles of fun together this past week.
16. Attend the Quilts for Kids workshop held at Pennington Quilt Works.
I attended the workshop and turned in my quilt. We will donate approximately 20 quilts this month.
17. Attend the annual Holiday Craft Show at
West Windsor-Plainsboro High School.
The Week of December 9, 2013
1. Finish the second clue for Bonnie Hunter's new online mystery
and start working on the third clue to be released on Friday.
2. Finish the Make It Snappy scarves started a few weeks ago.
3. Bind the Christmas Tree Log Cabin wall hanging recently quilted on Annie.
4. Work on the center block for Wildflower Rhapsody.
5. Continue to work through my Flylady inspired Christmas Control Journal.
6. Complete the next two blocks for the Byrne $5 quilt.
7. Work on some hemming and mending of garments.
8. Cut up a bag of scraps I've accumulated over the last few weeks.
9. Prepare month 3 for the Civil War Tribute quilt.
10. Work on the last block for the Paper-Pieced Heart Sampler.
11. Pull fabric for three quilts I will start in 2014
Tell it to the Stars - Patchwork Times
Fit for a Hero - Patchwork Times
Delightful Stars - The Quilting Gallery
12. Work on the following BRODY Projects:
Four-Patch Stacked Posies...Small Print
Four-Patch Stacked Posies...Large Print
Blue Palace
Meadow - A Christmas Quilt
Civil War Tribute
Two Flag of Valor Quilts
13. Work on the quilt currently loaded on Annie -
All Hand Dyes Go Together.
14. Add some more hexies to my Bonnie Hunter inspired
Christmas Hexie Quilt.
15. Work on the shawl I am crocheting for
the Prayer Shawl Ministry at St. David the King Church.
16. Spend a day with my little Ryder...including a sleepover!
17. Attend Saturday Sampler at Pennington Quilt Works.
I will certainly not get bored with this extensive list.
Until Next Time.....Happy Stitching!!!
Sharyn
No comments:
Post a Comment